Working as the sole E & I subcontractor to the Builder (Cantiere Navale De Poli SpA) Consmar was responsible for the installation of all electrical systems onboard the following fleet of sophisticated new buildings: power generation, power distribution, instrumentation & control, power management, E & l cargo equipment, cargo control & monitoring systems, navigation & communication equipment and accommodation areas.
All installation and testing work was carried out in accordance with the requirements of the Builder, Classification Societies and industry standards.
-
Jo Aigran D 1997
-
Jo Venezia 1998
-
Sveva 1999
-
Jo Laguna 2000
-
Jo Chiara D 2001
-
Jo Miro D 2002
-
Jo Vanni D 2003
-
Fase D 2004
-
Alessandro DP 2007
GasTankers
Consmar successfully delivered the complete E & I installation work onboard the subsequent gas tanker new buildings. This work was completed under subcontract with the Builder (De Poli Shipyard).
Scope of work was as for the chemical tanker new buildings with additional scope covering cargo gas refrigeration and reliquefication plant.
-
Electra Star 2003
-
Maya Star 2004
-
Venere 2004
-
Marte 2004
-
Coral Nettuno 2006
-
Coral Lophelia 2006

02
Asphalt Carriers
Kraljevica Shipyard
Consmar carried out the complete electrical installations onboard the series of advanced asphalt carrier new buildings. In addition to the E & I installation work Consmar was responsible for dock trials and sea trials.
-
Asphalt Seminole 2005
-
Asphalt Sailor 2006
-
Asphalt Transporter 2006
-
Asphalt Carrier 2010
-
San Lorenzo 2009
3.May Shipyard
Consmar delivered all electrical and installation work for the project
-
Palanca Luanda 2012
-
Sao Domingos Savio 2013
-
Palanca Sydney 2013
03
Passenger Ships and Ferries
Kraljevica Shipyard
Consmar was the sole E & I installation contractor working in co-operation with the Builders on the above Passenger/RO-RO ships of distinctive design.
-
Bella Desgagnés 2013 (Passenger/Container/Vehicle Vessel)
-
Wight Light 2008
-
(Ro-Ro/Passenger Ship)
De Poli Shipyard
Consmar delivered all electrical and installation work for the below vessels
-
Isola di Stromboli 1999
-
(Passenger/Ro-Ro Cargo Ship)
-
Several water buses, passenger ferries and car ferries (“Navigazione Interna Lagunare” type built) for Actv S.p.A. the Venice Public Transport Company.
04
General Cargo Ships
Kraljevica Shipyard
We provided the complete electrical installations onboard the general cargo sister ships built for Atlanska Plovidba Dubrovnik
-
Mokošica 2006
-
Šipan 2007
05
Other Ships
Uljanik Shipyard
Consmar will carry out E & I installation work in co-operation with Uljanik Shipyard and OEM representatives.
-
Bagtyyar (Ro-Ro/Passenger Ship) - Delivered 2015
-
Isaac Newton - Multipurpose Vessel (DP2 Cable Laying / Trenching Support Vessel / Subsea Rock Installation Vessel) - Delivered to Jan de Nul Group 2015
-
Siem Cicero (Car Carrier) - Under construction, delivery 2H2017
-
Apollo (Self Elevating Unit) - Under construction, delivery 2017
Apollo is a new jack-up vessel designed for construction and O&M work at offshore wind farms capable of operating in depths of up to 65 metres. Apollo was ordered by Belgium-based GeoSea N.V. and will be managed by DEME - Dredging Environmental and Marine Engineering N.V.