scroll down

 

(Production, storage and logistics of propene and propane in the Rijeka oil refinery)

 

PROPANE / PROPYLENE SPLITTER project (PPS U-391 and PPS TANK SPACE U-335 I INTERCONNECTING)

 

Work description:

- Electro-instrumentation works

- Welding works

- Locksmithing

 

Project duration: September 2019 - March 2020

 

Steinbach Vertriebs GmbH

(Company has a large product portfolio in the area of swimming pools: pools, filter systems, pool accessories, heating systems, maintenance, pool covers, installation parts and inflatable goods)

 

Project description:

- Electrical installation of a complete mixing plant including lighting and sockets as well as cabinet installation, cabling, cable routes, connection and checks

- Cabinet installation and connection

- Cable tray and pipes installation

- Pulling, tracing and connecting cables

- Support for I/O Check

 

Project duration: January  - February

 

Kläranlage Geldern

(Sewage plant)

 

Project description:

- Electrical installation of a complete cogeneration unit including cable tray and pipes installation

- Cabinet installation, cabeling, connection and checks

- Pulling, tracing and connection of cables

- Support for I/O Check

 

Project duration: November 2019. - February 2020.

 

HeidelbergCement AG - Werk Milke

(HeidelbergCement is one of the world’s largest building materials companies. With the takeover of the Italian cement producer Italcementi, HeidelbergCement became the number 1 in aggregates production, number 2 in cement, and number 3 in ready-mixed concrete.)

 

Project description:

- Cable tray & cable installation

- Erection of electrical panels

- Partly connection of cables

 

Project duration: October 2019. - December 2019.

 

Engie Kraftwerk Zolling

(The Zolling power plant is the power plant of Engie Kraftwerk Zolling GmbH & Co. KGaA that generates the power from fossil fuels since 1958. Its main component today is the coal block with an output of 472 megawatts. The production of the power plant can supply about 1.7 million people with electricity on average every year.)

 

Project description:

- Electrical installation works

 

Project duration: October 2019.

 

Lhoist Germany Rheinkalk GmbH - Plant Flandersbach

(Rheinkalk is a group of companies formed in 1999. It belongs to the Belgian Lhoist Group, the world's largest producer of lime and dolomite products. Seat of the enterprise is in Wülfrath in the administrative district of Duesseldorf.)

 

Project description:

- Disconnection and unmount of existing equipment

- Installation of 60m heavy duty cable ladder system

- Installation of approximately 30 local control boxes

- Installation of pipes and mesh tray to the drives and sensors from the main cable tray

- Electrical connections in the cabinets and fields

- Pulling approximately 200 power cable and control cable up to NYY-J 4x6mm2

 

Project duration: October 2019. - November 2019.

 

Meyer Turku Shipyard

(MEYER TURKU OY is one of the leading European shipbuilding companies. It is specialized in building cruise ships, car-passenger ferries and special vessels. Over the years the shipyard has built more than 1,300 new ships for customers around the world.)

 

Project description:

- Electrical installation services on ship NB1394

 

Project duration: July 2019. - October 2019.

 

Staustufe Koblenz

(The Koblenz barrage is the last barrage on the Moselle before the confluence with the Rhine in Koblenz. It is equipped with a roller weir, two locks for large motor cargo vessels, a boat lock, a hydroelectric power plant and a fish ladder.)

 

Project description:

- Disassembly of old equipment (cable/switchgear)

- Construction of cable trays

- Cabeling

- Installation of switchgear cabinets

- Assembly of DC-system

- Connection work and remaining tasks

 

Project duration: June 2019. - October 2019.

 

Spenner GmbH & Co. K

(Company that provides cement products and services.)

 

Project description:

- Electrical installation of a complete cement silo including lighting and sockets, cabinet installation, cable routes, connections and checks

- Cabinet installation and connection

- Cable tray and pipes installation

- Pulling, tracing and connecting cables

- Support for I/O Check

 

Project duration: June 2019. - September 2019.

 

Kraftwerk Maria Steinbach

(Barrage)

 

Project description:

- Construction of  cable trays 

- Cabeling

- Installation of switchgear cabinets

- Assembly DC-system

 

Project duration: June 2019. - July 2019.

 

Rhein-Main-Donau AG - Kraftwerk Ellgau

(Rhein-Main-Donau AG  is a private infrastructure company based in Munich that provides power supply from hyrdropower and water.)

 

Project description:

- Construction of cable trays 

- Cabeling 

- Installation of switchgear cabinets

 

Project duration: May 2019. - July 2019.

 

HeidelbergCement AG - Zementwerk Hannover

(HeidelbergCement is one of the world’s largest building materials companies. With the takeover of the Italian cement producer Italcementi, HeidelbergCement became the number 1 in aggregates production, number 2 in cement, and number 3 in ready-mixed concrete.)

 

Project description:

- Disconnection and removal of existing cabinets

- Installation and reconnection of new cabinets

- Cable tray and pipes installation

- Pulling, tracing and connecting cables

 

Project duration: February 2019. - March 2019.

 

Kraftwerk Maria Steinbach

(Barrage)

 

Project description:

- Construction of  cable trays 

- Cabeling

- Installation of switchgear cabinets

- Assembly DC-system

 

Project duration: February 2019. - March 2019.

 

HeidelbergCement AG - Werk Milke

(HeidelbergCement is one of the world’s largest building materials companies. With the takeover of the Italian cement producer Italcementi, HeidelbergCement became the number 1 in aggregates production, number 2 in cement, and number 3 in ready-mixed concrete.)

 

Project description:

- Cable tray & cable installation

- Erection of electrical panels

- Partly connection of cables

 

Project duration: January 2019. - March 2019.

 

Fels - Werke GmbH - Kalkwerk Rüdersdorf

(Fels - Werke GmbH is one of Europe’s leading suppliers of lime. Fels stands for high-quality quicklime and lime products as well as mineral aggregates.)

 

Project description: 

- Disconnection and removal of existing cabinets

- Installation and reconnection of new cabinets

- Cable tray and pipes installation

- Pulling, tracing and connecting cables

 

Project duration: January 2019. - March 2019.

 

Lhosit Western Europe Rheinkalk GmbH

(Rheinkalk is the German company of the Belgian Lhoist group- the world's largest manufacturer of lime and dolomite products.)

 

Project description:

- Cable tray & cable installation

- Erection of electrical panels

- Partly connection of cables

 

Project duration: October 2018. - March 2019.