Projects 2026.

  • Viktor Lenac Shipyard, Croatia 

        (shipyard)

 

Project description:

• Electrical installation services on vessels:

DALMACIJA

KORČULA

JURAJ DALMATINAC

ATHENA

ARTEMIS

USS HERSHEL WOODY WILLIAMS

AL MIRQAB

USNS BRUCE C HEEZEN

BREB CUXHAVEN

JAGUAR

SPRITZ

KIJAC

VERVECE

MSC ALIX 3

LOŠINJ

MARKO POLO

MARJAN

GREEN SPINEL

RED OPAL

 

Description of works:

- construction of cable trays

- inserting cables according to schemes

- maintenance and inspection of equipment

- marking all cores and cables with the appropriate marking

 

Project duration:  January 2025. - present

 

 

  • Viktor Lenac Shipyard, Croatia

(shipyard)

 

Project description:

• Electrical installation services on:

 

USS PULLER T-ESB 3

- electrical installation services

- electrical assistance for the needs of shipowner

Duration of works:  September 2025. - present

 

SHIPYARD FACILITIES

- inspection, completion, repair and measurement of grounding resistance on electrical cabinets of all shipyard facilities

Duration of works: January 2026.

  • 3. MAJ Shipyard JSC, Croatia

       (shipyard)                                                                                                                                                                                                                                                             NEW CONSTRUCTION - 527

Self-unloading ship for the transport of bulk cargo - very specific because it was designed for the needs of the original customer - Canadian Algoma and navigation on the North American Great Lakes

 

Project description:

- according to the defined blueprints and list of materials - laying and bracing all the cables, mounting all the devices, inserting and connecting the cables to the electrical appliances, cargo space fans, lighting, lighting distributors and fire alarm

- mark all wires and cables with appropriate markings

- take all devices.

- test the functionality of the lighting

- mount nameplates and hand over the necessary programs to the shipowner and the registry

- planned tasks include daily cleaning of the space from excess built-in material and maintaining the orderliness of the space itself
 

Duration of the works: January 2026.

​

 

  • 3. MAJ Shipyard JSC, Croatia

       (shipyard)       

       NEW CONSTRUCTION - 739       

Luxury expedition polar cruiser Scenic Ikon, which is being built for the Scenic group, ordered by MKM Yachts

                                 

Project description:

- laying and bracing all the cables

- mounting all the devices

- inserting and connecting the cables to the electrical appliances, cargo space fans, lighting, lighting distributors and fire alarm

​

Project duration: September 2026. - present

  • INA d.o.o., Croatia

(production, storage and logistics of propene and propane in the Rijeka oil refinery)

 

Project description:                                                                                                                         

- electrical installation works on the project "BHRK371 Residue Upgrade Program of the Rijeka Refinery

 

Project duration: January 2025. - present

 

 

  • INA d.o.o., Croatia

(production, storage and logistics of propene and propane in the Rijeka oil refinery)

 

Project description:

- electrical instrumentation works in Rijeka oil Refinery

 

Project duration: January 2026. - present

 

​

  • Dublin, Ireland

DIAGEO GLOBAL SUPPLY

(wine, beer, spirits and other alcoholic beverages manufacturing)

 

Project description:

- electrical installation services

 

Project duration: January 2026.

​

 

  • Toulouges, France

BRASSERIE MILLES

(beer manufacturer)

 

Project description:

- electrical installation of botling line                                                                                                  

- cabling of botling line                                                                                                                             

 

Project duration: January 2026.

 

 

  • Cholet, France

L'ABEILLE

(production of non-alcoholic beverages)

 

Project description:

- electrical installation of botling line                                                                                                   

- cabling of botling line                                                                                                                            

 

Project duration: January 2026. - February 2026.

​

​

  • Merville, France

NOKO KOMBUCHA

(production of non-alcoholic beverages)

 

Project description:

- electrical installation of botling line                                                                                                   

- cabling of botling line                                                                                                                            

 

Project duration: May 2026. - June 2026.

​

​

  • Lübeck, Germany

ZEMENTWERK LÜBECK

(grinding cement plant)

 

Project description:

- cable routing

- cable pulling

- installation of on-site control panels and junction boxes

- electrical installation of motors and sensors

- installation of control cabinets

​

Project duration: July 2026.

​

​

  • Allmendingen, Germany

SCHWENK ZEMENT GMBH & CO. KG - WERK ALLMENDINGEN 

(integrated cement plant)

 

Project description:

- construction of cable trays

- cabling

- installation of switchgear cabinets

- connection work and remaining tasks                                                                                                                                                                                                       

Project duration: October 2026. - December 2026.