Projects 2021.

  • Vinadio (Cuneo), Italy

Fonti di Vinadio S.P.A.

Italian bottler and distributor of Acqua Sant' Anna mineral water (one of the leading national brands in the sector) 

 

Project description:

• Electrical installation KRONES LINE

- installation, commissioning, maintenance and overhaul of machinery and installations for the bottling industry

 

Project duration: February 2021. - March 2021.

  • 3. MAJ Shipyard JSC

Chemical Tanker

DWT:  50.000

Loa (m):  182,90

B (m):  32,20

H (m):  17,50

 

Project description:

 

- construction of cable trays, installing lighting, alarms, fire alarms and other small hardware according to the defined designs

 

- installing the electrometal equipment on the walls and ceiling, inserting cables, connecting electrical devices, alarm points, lighting, SUL equipment and fire alarm in the engine room, steering machine, hatch and chimney according to drawings

 

- marking all cores and cables with the appropriate markings

 

- testing the functionality of the lighting and performing proper grounding on all electrical devices

 

- installing the nameplates

 

Project duration: November 2020. - March 2022.

  • Wesel, Germany

Kläranlage Wesel

(wastewater treatment plant)

 

Project description:

- construction of cable trays, cabling

- erection of electrical panels

- installation of switchgear cabinets, connecting cables

- cabling optical fibre

- cable installation

- assembly DC-system, connection works

 

Project duration: February 2021. - October 2021.

 

  • Ellgau, Germany

Rhein-Main-Donau AG - Kraftwerk Ellgau

(provider of power supply from hyrdropower and water)

 

Project description:

- dismantling, demolition

- reconnection

- cable pulling works

 

Project duration: March 2021. / June 2021.

 

  • Günzburg, Germany

Obere-Donau-Kraftwerke AG

(provider of power supply from hyrdropower and water)

 

Project description:

- construction of cable trays, cabling

- installation of switchgear cabinets

- connection works

 

Project duration: April 2021. - May 2021.

 

  • Marl, Germany

Obere-Donau-Kraftwerke AG

(provider of power supply from hyrdropower and water)

 

Project description:

- construction of cable trays, cabling

- erection of electrical panels

- installation of switchgear cabinets, connecting cables

- cabling optical fibre

- installation and termination cables

 

Project duration: August 2021. - September 2021.

  • Geseke, Germany

HeidelbergCement AG - Werk Milke

(building materials producer)

 

Project description:

- construction of cable trays, cabling

- erection of electrical panels

- installation of switchgear cabinets, connecting cables

- cabling optical fibre

- cable installation

- installation and termination cables

 

Project duration: August 2021. - September 2021.

 

 

  • Cadiz, Spain

M/N Carnival Victory

(cruise ship)

 

Project description:

- termination and connection of previously installed cables - as per drawings and specifications Wartsila APSS

- channel checking activities for valve panels and automation panels

 

Project duration: May 2021. / July 2021.

 

Piombino, Italy

M/N NCL Oceania Nautica

(cruise ship)

 

Project description:

- termination and connection of previously installed cables - as per Wartsila APSS drawings and specifications

- replacement activity no. 15 "swing frame" automation panels as per drawings

 

Project duration: August 2021.

 

  • Piombino, Dubai

M/N Constellation

(pipe layer ship)

 

Project description:

- laying new power cables

- cable pulling

- connection works

 

Project duration: September 2021. - October 2021.

 

  • Piombino, Italy

M/N NCL Oceania Nautica

(cruise ship)

 

Project description:

- ellectrical installation works

- cable pulling

- connection works

 

Project duration: August 2021. - September 2021.

 

  • Lemwerder, Germany

M/N NCL Gorch Fock

(tall ship of the German Navy)

 

Project description:

- mechanical fitting and electrical installation works

- connection works

 

Project duration: August 2021.

 

  • Wolfsburg, Germany

Wolfsburg west power station

(coal-fired power plant at Volkswagen Wolfsburg facility)

 

Project description:

- mechanical fitting and electrical installation works

- cable pulling

- installation of switchgear cabinets

- connection works

 

Project duration: August 2021. - December 2021.

 

  • Berlin, Germany

Heidelberg cement AG - Königs Wusterhausen

(producer of building materials)

 

Project description:

- assembly work on the project RN - 3416 IBAU-Koenigs

Wusterhausen, Germany - Limestone Powdersilo

- ellectrical installation works

- cable pulling

- installation of switchgear cabinets

- connection works

 

Project duration: September 2021. - December 2021.

  • Jupille-sur-Meuse, Belgium

AB INBEV

(beer and other beverages manufacturer)

 

Project description:

- cabling and connecting of 2 new Krones fillers

- connection works

 

Project duration: October 2021.

  • Breuna, Germany

VITAQUA GMBH

(manufacturer of mineral water and other soft drinks)

 

Project description:

- dismantling of an existing bottling line

 

Project duration: October 2021.

  • Milano (Induno Olona Va), Italy

CARLSBERG ITALIJA S.P.A.

(beer manufacturer)

 

Project description:

- ellectrical installation works

- cable pulling

- installation of switchgear cabinets

- connection works

 

Project duration: December 2021.