top of page
  • Viktor Lenac Shipyard, Croatia

(shipyard)

 

Project description:

• Electrical installation services on vessels:

DALMACIJA

KORČULA

JURAJ DALMATINAC

ATHENA

ARTEMIS

USS HERSHEL WOODY WILLIAMS

AL MIRQAB

USNS BRUCE C HEEZEN

BREB CUXHAVEN

JAGUAR

SPRITZ

KIJAC

VERVECE

MSC ALIX 3

LOŠINJ

MARKO POLO

MARJAN

GREEN SPINEL

RED OPAL

 

Description of works:

- construction of cable trays

- inserting cables according to schemes

- maintenance and inspection of equipment

- marking all cores and cables with the appropriate marking

 

Project duration:  January 2025. - present

 

 

  • Viktor Lenac Shipyard, Croatia

(shipyard)

 

Project description:

• Electrical installation services on:

 

  • USS PULLER T-ESB 3

- electrical installation services

- electrical assistance for the needs of shipowner

Duration of works:  September 2025. - present

 

  • SHIPYARD FACILITIES

- inspection, completion, repair and measurement of grounding resistance on electrical cabinets of all shipyard facilities

Duration of works: January 2026.

 

  • 3. MAJ Shipyard JSC, Croatia

(shipyard)                                                                                                                                               

NEW CONSTRUCTION - 527

Self-unloading ship for the transport of bulk cargo - very specific because it was designed for the needs of the original customer - Canadian Algoma and navigation on the North American Great Lakes

 

Project description:

- according to the defined blueprints and list of materials - laying and bracing all the cables, mounting all the devices, inserting and connecting the cables to the electrical appliances, cargo space fans, lighting, lighting distributors and fire alarm

- mark all wires and cables with appropriate markings

- take all devices.

- test the functionality of the lighting

- mount nameplates and hand over the necessary programs to the shipowner and the registry

- planned tasks include daily cleaning of the space from excess built-in material and maintaining the orderliness of the space itself
 

Duration of the works: January 2026.

 

 

  • INA d.o.o., Croatia

(production, storage and logistics of propene and propane in the Rijeka oil refinery)

Project description:                                                                                                                         

- electrical installation works on the project "BHRK371 Residue Upgrade Program of the Rijeka Refinery

Project duration: January 2025. - present

 

 

  • INA d.o.o., Croatia

(production, storage and logistics of propene and propane in the Rijeka oil refinery)

Project description:

- electrical instrumentation works in Rijeka oil Refinery

Project duration: January 2026. - present

 

  • Dublin, Ireland

DIAGEO GLOBAL SUPPLY

(wine, beer, spirits and other alcoholic beverages manufacturing)

 

Project description:

- electrical installation services

 

Project duration: January 2026.

 

  • Toulouges, France

BRASSERIE MILLES

(beer manufacturer)

 

Project description:

- electrical installation of botling line                                                                                                  

- cabling of botling line                                                                                                                             

 

Project duration: January 2026.

 

 

  • Cholet, France

L'ABEILLE

(production of non-alcoholic beverages)

 

Project description:                                                                                                                         

- electrical installation of botling line                                                                                                   

- cabling of botling line                                                                                                                            

 

Project duration: January 2026. - February 2026.

bottom of page